Mostly Worked On My Shack Today

Cause I’m Old, Retired, and had the time. And it needed to be done. So I cut and reinstalled the “tech” counter-top, cut the 16 1/4 inch wide part of the counter-top I needed to fill a hole and put that in, re-ran wires and everything is up and working.

2015-03-30 16.17.00

Only took 4 hours. I suppose if I hadn’t been “watching” Captain America it would have gotten done quicker. Ah well. Plus the Sun came out for awhile and I was set up to do the cutting outside and I probably spent way too much time just enjoying the (t-shirt) weather. Otherwise I probably could have gotten the job done in about 4 hours or so.

2015-03-30 16.17.30

Not done with my shack; but getting there one job at a time. And it’s not perfect, but usable and nothing should fall over and kill someone.

Other than all that, SSDD Monday.